Georgia DOT advances a six-lane SR 21 widening

GDOT is advancing a six-lane widening of SR 21 through Chatham and Effingham counties.

Gallery1 / 2

GA21SB at GA30, Port Wentworth, Chatham County, Georgia
Project imageGA21SB at GA30, Port Wentworth, Chatham County, GeorgiaMichael Rivera / Wikimedia Commons (CC BY-SA 4.0)
GA21 at Crossgate Rd WB, Port Wentworth, Chatham County, Georgia
Project contextGA21 at Crossgate Rd WB, Port Wentworth, Chatham County, GeorgiaMichael Rivera / Wikimedia Commons (CC BY-SA 4.0)

Georgia DOT is taking public input on a plan to widen SR 21 from south of Cook Street in Chatham County to north of McCall Road in Effingham County. The proposal would rebuild the corridor as a six-lane, median-divided highway with intersection improvements. The state lists right-of-way work in 2027 and construction in 2029, with a current construction estimate of about $99.2 million.

Why it matters

The project targets capacity and safety on one of the region’s main north-south commuter and freight corridors.

What to watch

Watch for right-of-way work scheduled for 2027 and the construction phase currently listed for 2029.

Scale6 lanes · about $99.2M construction estimate
TimelineRight of way 2027 · construction 2029
WhoGeorgia DOT
Sources and documents3 sources

See an error, or have an update on this project? Tell Urban Savannah.

Connected coverage

Follow the thread

All updates →

Explore the projects, places, developers and public systems connected to this story. Each card explains the link.

Talmadge BridgeChatham County

Both involveGeorgia DOT

Program

Talmadge Bridge program reaches 4.39%

Georgia DOT’s current project dashboard now lists the overall Talmadge Memorial Bridge maintenance project at 4.39 percent complete. That is a later official status for the same project and pointer already verified on September 30; GDOT’s project page still separates the overall program from the cable-replacement work package, whose field work was expected in the fourth quarter of 2026.

Chatham County Sep 30, 2026
Project: Talmadge Memorial Bridge Cable Replacement